Proof of Work

Real systems. Real operations. Real outcomes.

Before Sentric had a name, our founder was already doing the work inside one of the Pacific Northwest's most operationally demanding environments. Here's what that looked like.

Case Study 01

Planning Time: 40 Hours to Under 4

40h → <4h
36 hours returned every week.
The Problem

A Pacific Northwest defense manufacturer's production planning process took 40 hours of manual work every week. It was unsustainable, unreliable, and completely dependent on one person to hold it together.

What We Did

We designed and deployed a custom planning dashboard that automated data collection, consolidated visibility into one place, and cut out the redundant manual steps that were eating the week.

The Result

Weekly planning time dropped to under 4 hours. Same output. 36 hours returned to the business every single week.

Case Study 02

Procurement: 30 Minutes to Under 2

30m → <2m
Decision-ready quotes in minutes.
The Problem

Getting quotes from suppliers took 30 minutes per cycle. Manual outreach, manual follow-up, manual consolidation before anyone could make a decision. It was slow and it added up fast.

What We Did

We built an automated RFQ tool that sends requests, reads responses, and consolidates supplier quotes into one decision-ready view without anyone touching it.

The Result

Each procurement cycle now runs in under 2 minutes. Faster decisions, less labor, nothing lost.

Case Study 03

$164,000 in Material Savings

$164K
Verified annual savings.
The Problem

Raw material costs weren't being managed at the system level. No consistent procurement process meant money was quietly walking out the door with every purchase order.

What We Did

We put systematic procurement disciplines and supplier management processes in place across the operation.

The Result

Average raw material cost dropped 2.9% per piece. That added up to $164,000 in verified savings in a single year.

Case Study 04

ERP Migration. No Downtime.

0 Days
No operational disruption.
The Problem

A full site migration to a new ERP system is the kind of project that breaks things. Downtime, data gaps, teams who can't do their jobs. Most manufacturers just accept that as part of the process.

What We Did

We led the full migration from start to finish. System setup, data validation, workflow continuity, and post-launch stabilization until everything ran clean.

The Result

Migration finished on deadline. No disruption. No productivity loss. Teams kept working like nothing changed.

Your business deserves the same level of thinking.

Start with a Bottleneck Audit. We'll identify your three biggest operational breakdowns and deliver them to you in writing within 24 hours.

$500 flat rate. No surprises.